Daley Ice-Bridge Post Pipe Boot

Part Number: DTMPBP

  • Daley’s Ice-Bridge Post Pipe Boot allows for ice-bridge installation on top of an existing concrete slab.
  • Pipe Boot is made from 3-1/2″ Schedule 40 Pipe (4″ OD) and is designed to fit Daley’s Standard Ice Bridge Posts.
  • Includes Pipe Boot and (4) ½” x 4-1/2″ Wedge Anchors
  • Approximate Weight – 16 lbs.
  • All Components are Hot-Dipped Galvanized.
  • Call our manufacturing facility for additional installation options.
  • Related Items
Part Number: DTMPBP Category: